欧美人与动牲交A精品,BBBMN兽交毛片,亚洲A片成人无码久久精品青桔,少妇真实被内射视频三四区,丰满少妇猛烈A片免费看观看,公粗一晚六次挺进我密道视频,久久9精品区-无套内射无码,麻豆WWWCOM内射软件,坐在男人嘴上让他添在线视频,老师在我胯下娇喘吞精

Chinese | Englih
Home >News

Hot press safety operation and maintenance procedures

Date:2019-3-1 10:47:09 Source: Popularity:

I. Operating procedures

1、Check whether the surface of the platen and the auxiliary laminate (high temperature mylar, etc.) is clean. If there is pieces of wood and dirt, clean them directly. Check whether the auxiliary laminate (high temperature mylar, etc.) is damaged, replace it immediately. Check the heating system of the press whether the heat conduction oil is sufficient. Oil with a depth of 2-5cm should be retained at the bottom of the expansion tank, otherwise it should be added timely.

2、Switch on the power, set the working temperature of the press according to the processing requirement. After this, turn on the circulating pump switch and heating control switch to start the press temperature control system.

    3、Remove the protective cover of the time relay panel for pressure holding and timing, and set the pressure holding time according to the processing requirement.

    4、 According to the workpiece area and required unit pressure(kg/c㎡), look up the biggest required force from the pressure curve on the hot press. Adjust the button of pressure controller, the red needle in the pressure controller dial is the upper limit pressure, while the black needle is the system working pressure. Adjust deasil, pressure setting decrease, adjust anticlockwise, setting increase.

    5、After finishing the setting, and the temperature reaches the setting point, workpieces can be processed.

    Put the workpieces on right position,see blew pictures;

    ①right position(width way)

         

  圖片1.png        圖片2.png

    圖片3.png      圖片4.png

                

                          

② right position(length way)

          

圖片5.png    圖片8.png

    圖片7.png    圖片6.png

          

6、If the workpiece is skewed in the press, please straightened with long wooden strip. The operator is not allowed to touch the platen and leave during press closing. The operator shall pay attention to the working condition of the equipment and the workpiece. In case of any abnormality, stop the closure immediately. It is strictly prohibited to touch the workpiece or the platen and the transmission part by hand during machine closing to prevent extrusion and scalding accidents

7、When finishing the pressure holding time, the press stop automatically, the platen will be lowered, take out the workpiece with a wooden strip

8、After finishing working, clean the platen surface, close the press without pressure. Turn off the heating system and main power until temperature of the press is below 60℃, clean up the working site.

II、Daily maintenance and standard

item

place

standard

time

  1

Hydraulic system

No leakage, suitable oil quantity

Check every shift and add oil in time

  2

Heating system

No leakage, suitable oil quantity

Check every shift and add oil in time

  3

platen

Clean, no dirt

Check every shift and clean up

  4

Synchronization system

Reliable and flexible

Check every shift and add grease every week


主站蜘蛛池模板: 临颍县| 花垣县| 松潘县| 岳池县| 民县| 扬中市| 濮阳市| 镇康县| 镇沅| 海林市| 嘉荫县| 收藏| 麻城市| 来宾市| 胶州市| 隆德县| 祁阳县| 四平市| 弥渡县| 奉贤区| 祥云县| 大同县| 茌平县| 宁津县| 贵德县| 大同市| 海伦市| 九江市| 康定县| 昂仁县| 磴口县| 梁河县| 吴堡县| 皋兰县| 炉霍县| 汕尾市| 无极县| 县级市| 翁牛特旗| 双江| 华坪县|